feature-img

Waterfalls and Cable Car in Hatta Sustainable Project to be completed in 2022

October 11, 2021

The Emirates is big on renovation plans to transform Hatta into a major tourist attraction in Dubai. The Hatta sustainable waterfalls project is expected to be finished by mid-November next year. Unveiled by His Highness Sheikh Mohammed bin Rashid, Vice President and Ruler of Dubai, the ‘ Dubai Summit’ project will contribute to the overall development of Hatta region which includes the construction of a 5.4-kilometre cable car to transport tourists to the summit of Um Al Nesoor on the mountain peak . At 1,300 metres above sea level, it is the highest natural summit in Dubai.

The upper dam’s slope will be used to create a natural waterfall. Water will be collected at the end of the stream, recycled and pumped back into the dam. Fishes bred in the stream will provide an additional attraction for family tourists. The area would be designed to include a lineup of restaurants and recreational spaces.


Disclaimer: The stories are a work of fiction based on facts. Identies and details may have been altered to suit the narrative.